This parameter defines the base on which the Calc. Unit Cost Material shall be calculated and updated. You can choose between the following options:
Calculation Base Calc. Unit Cost |
Function |
Standard Cost |
The Calc. Unit Cost Material will be updated with the value of the Standard Cost field. |
Last Direct Cost |
The Calc. Unit Cost Material will be updated with the value of the Last Direct Cost field. |
Average Cost |
The Calc. Unit Cost Material will be updated with a calculated average cost. |
Locked |
The Calc. Unit Cost Material will not be updated. |
Last Direct Cost + Indirect Cost + Overhead Rate |
The Calc. Unit Cost Material will be updated with ( Last Direct Cost) + ( Last Direct Cost * Indirect Cost % / 100) + ( Overhead Rate). |
Average Cost + Indirect Cost + Overhead Rate |
The Calc. Unit Cost Material will be updated with a calculated average cost + ( Last Direct Cost * Indirect Cost % / 100) + ( Overhead Rate). |
Standard Cost + Indirect Cost + Overhead Rate |
The Calc. Unit Cost Material will be updated with ( Standard Cost) + ( Last Direct Cost * Indirect Cost % / 100) + ( Overhead Rate). |
Last Direct Cost + Item Charge |
The Calc. Unit Cost Material will be updated with the value of the Last Direct Cost field + Item Charge. |
Average Cost + Item Charge |
The Calc. Unit Cost Material will be updated with a calculated average cost + Item Charge. |
Standard Cost + Item Charge |
The Calc. Unit Cost Material will be updated with the value of the Standard Cost field + Item Charge. |